Roads & Transport Authority | Dubaï Tram

Roads & Transport Authority | Dubaï Tram

SYSTRA designed and managed the United Arab Emirate’s first LRT/tram line which was geared to improve public transport services in Dubai’s Al Sufouh and Marina residential, tourist and business districts.

All stations are air-conditioned and equipped with platform screen doors due to the city’s extreme climate. The introduction of automatic train protection and operation (ATP/ATO) systems was also a major first. Automatic vehicle protection (AVP) and automated platform screen door systems protect specific points (around signals, station entrances when platform screen doors are open) and supervised vehicle operation (SVO) systems help drivers to align their tram doors with station platform screen doors. Lastly, it’s also the first LRT/tram line in the world to be entirely powered by a ground level third conductor rail.

The current line spans a total of 6 miles, encompassing 11 stations and offers connections to the Dubai monorail and metro network. A second phase extends the line by a further 2.8-mile to increase range for the growing metropolis.

Top of the page

Read also

NJ Transit | Design-Build-Operate-Maintain, Hudson-Bergen Light Rail Station, Architectural Design of 21 Stations
NJ Transit | Design-Build-Operate-Maintain, Hudson-Bergen Light Rail Station, Architectural Design of 21 Stations
The Hudson-Bergen Light Rail Transit System was the first in the U.S. to be (...)
Ironbound X-Change Outdoor Performance Venue
Ironbound X-Change Outdoor Performance Venue
SYSTRA developed a concept for X-CHANGE, a kinetic structural cover for (...)
WMATA | Design-Build for Orange and Blue Line Rail System, Stadium Armory to National Airport
WMATA | Design-Build for Orange and Blue Line Rail System, Stadium Armory to National Airport
SYSTRA served as the Lead Designer on this design-build project, which (...)
WMATA | Design-Build for Andrews Federal Center Bus Operations & Maintenance Facility
WMATA | Design-Build for Andrews Federal Center Bus Operations & Maintenance Facility
The Andrews Federal Center Bus Operations and Maintenance Facility project (...)
TBTA | Brooklyn Battery Tunnel Service Building Upgrade
TBTA | Brooklyn Battery Tunnel Service Building Upgrade
Scope of work included a full condition assessment of the Brooklyn-Battery (...)
SYSTRA USA New Headquarters in Downtown Manhattan
SYSTRA USA New Headquarters in Downtown Manhattan
SYSTRA designed a 14,300-square-foot office space for its new headquarters (...)
SYSTRA Newark Office
SYSTRA Newark Office
Located in the heart of the booming Newark Business District, this (...)
SJTA | Snow Removal Equipment Storage Building
SJTA | Snow Removal Equipment Storage Building
The project involved the design of a new 36,000-square-foot facility for (...)
SCO Family of Services | Building Condition Assessments
SCO Family of Services | Building Condition Assessments
SYSTRA assessed building conditions of five properties with 29 buildings (...)
Réseau Ferré de France | Multimodal Exchange Terminal St Augustin Airport
Réseau Ferré de France | Multimodal Exchange Terminal St Augustin Airport
Réseau Ferré de France (RFF) called upon SYSTRA to develop the feasibility (...)
Prudential Financial | Gateway Center Dining Room
Prudential Financial | Gateway Center Dining Room
Gateway Center Dining Room converted multiple small compartmentalized (...)
Prudential Financial | QMA Restack
Prudential Financial | QMA Restack
In order to address modernizations with the groups branding aesthetic, (...)
SYSTRA A+E 1 Gateway Center, 11-43 Raymond Plaza West, Suite 1520, Newark, NJ 07102, USA | We are a proud member of the U.S. Green Building Council.
Contact